Trustees

Facilities Projects
 
  • Prime and paint exterior steel cross (Rust-o-lium White).
  • Replace 1 ½” ball valve water main shut off at building.
  • Replant Newhope planter box with drought tolerant plants.
  • Pressure-wash Fellowship Patio.
  • Replace Hanging plants under Fellowship patio.
  • Test/ Repair drip system under Fellowship Patio.
  • Fix “Exit” Light closest to the Sound both in the Sanctuary.
  • Replace burned out light bulb in the Sanctuary (ceiling fan light).
  • Evaluate/ build/ install supply air boxes/ register in Sanctuary.
  • Rehab Janitors closet for School (walls in bad shape).
  • Replace Light fixture in hall between classrooms.
  • Knock down dirt pile next to Teacherage gate.
  • Replace wood 2X6 around long jump pit, make lid.
  • Remove trees growing in R.R. fence
  • Re-level Pioneer shed.
  • Evaluate/ Repair Sprinkler at Parsonage.
  • Replace rolled roof on Patio room Parsonage.
  • Replace double doors on Garden shed.
  • Remove old paint cans from Garden shed.
  • Remove/ reset stepping stones to gate at Teacherage.
  • Install Wireless access point in multipurpose room.
  • Build steel carts for metal chairs. (Sporting events).
  • Patch/ repair/ paint exterior doors (all buildings).
  • Vacuum out sump pump basin in front of Green room.
  • Clean and fill cracks in parking lot (see drawing).
  • Repair rusted “Drip edge” on roofs.
  • Repair Fellowship Patio roof/ fascia boards.
  • Repair Dry-Rot all buildings.
  • Coat White roofing on School and Sanctuary.
  • Trim out Return air grill in Parsonage.
  • Build/ install/ paint soffit chase for Roof A/C line set Parsonage.
  • Standardize/ replace exterior light fixtures.
  • Get quote to replace concrete by Newhope entrance.
  • Purchase/ replace balance of old windows in school.
 
Teacherage

 
  • Touchup landscaping in back yard.
  • Door shoe/ weather strip front door.
  • Replace Roof.